Project Datasheet

Bridges Market Sector

Project: Haydon Bridge  

For more details please contact:

Peter Miller
Director
Watson Steel Structures Ltd
+44 (0) 1204 696 675
enquiries@watsonsteel.co.uk
Client: Highways Agency
Location: Haydon
Northumberland
Country: England
Partners: Main Contractor: Volker Stevin
Architect: Capita Symonds
Engineer: Capita Symonds
Statistics: Total Tonnage: 600 tonnes
Programme: 28 Weeks
Completion Date:  September 2008
Overview: The new bridge is a key part of the new £24.7m A69 Haydon Bridge Bypass. The bridge incorporates almost 600 tonnes of structural steelwork and includes a four-span viaduct over the Newcastle to Carlisle railway line and the River South Tyne.

Watson Steel Structures Ltd were responsible for the connection design and fabrication of the structural steelwork required for the bridge, together with the supply and fix of edge protection.

The works were carried out on site with an excellent health and safety performance.
       